But, "ideally, we would really like to be in the [Pudding] building," Decherd says.
Physical Priorities
The current theater is simply inadequate, Illingworth says. The seats are too small, theatrical productions are forced to bring in their own lights and the backstage space and dressing rooms are substandard.
The planning committee will have to figure out a way to maintain the current seating capacity of about 350, even though the actual size of each seat will have to be enlarged to comply with building codes.
Maintaining the seating capacity is important for ticket revenues, and Illingworth speculates that building a balcony level may be a solution.
Additionally, Roiff says, the theater will require a box office and a lobby.
"The entire building could conceivably be filled with parts of the theater," says Roiff. "Our main focus at this stage is to figure out how to revitalize the theater as a centerpiece of the building."
Read more in News
Timeline of the Presidential SearchRecommended Articles
-
Faculty Will Take Control of Hasty Pudding BuildingThe Faculty of Arts and Sciences (FAS) will take ownership of the Hasty Pudding building according to an agreement negotiated
-
UC Welcomes Pudding Takeover, Hopes to Influence RepairsWhen Associate Dean of the College David P. Illingworth '71 announced last week the recently acquired Hasty Pudding building would
-
Illingworth Weighs Pudding ChangesThe Hasty Pudding stage has seen its share of glitter, feathers and sequins over the years, as home to the
-
A New Role for the PuddingThe University's imminent takeover of the Hasty Pudding building, announced last week, promises to be a win-win situation for students.
-
Safety Inspection May Close Pudding for Two YearsAn independent contractor will inspect the worn Hasty Pudding building in the next month to see if it is safe
-
Harvard Settles With Pudding RestaurantPutting an end to months of legal wrangling, Harvard University and the restaurant UpStairs at the Pudding announced yesterday that