Advertisement

KIRKLAND BUILDS WALLS, ELIOT PLANTS SHRUBBERY

Concrete piers are at present being put in between Kirkland House and the Master's Lodgings in preparation for a brick wall such as exists between the two units of Winthrop House. A gate will be installed to permit passage to the dining hall. The wall will be topped by an iron spiked fence.

Surveying of the Eliot House campus is now being carried on to prepare for the planting of shrubbery and a number of trees. It is expected that a flower bed will be laid alongside the brick terrace.

Advertisement
Advertisement