The artesian well beside Memorial Hall, which has been under construction since June, is now nearly finished, and will be ready for use as soon as the electric pump now being built is installed. The well is 321 feet deep with an eight inch pipe and will supply water at the rate of 50 gallons a minute. When completed, the whole structure and machinery of the well will be entirely underground.
Read more in News
Whist Team Defeated.